Burns Mall – Main Switchboard Replacement
10 October 2020
Provision of main switchboard to replace existing superseded switchboard.
The new switchboard was manufactured utilising the Hager Quadro+ evo system to Form 4 type 5. Special requirements from the customer included a rear termination chamber to suit the existing cabling on site.
Switchboard Features
- Lorem ipsum dolor sit amet, consectetur adipiscing elit.
- Aenean diam lorem, faucibus maximus felis at, volutpat scelerisque enim.
- Morbi vitae elit sapien.
- Maecenas condimentum mollis pretium.
- Nullam et posuere sapien, ut sodales orci.
- Etiam tristique erat eget ex porta facilisis.
- Nullam at mi egestas, blandit nisl posuere, porttitor dui.
- Nam at purus eu metus dignissim cursus.
- Aenean vel commodo nibh.
Customer Benefits
- Lorem ipsum dolor sit amet, consectetur adipiscing elit.
- Aenean diam lorem, faucibus maximus felis at, volutpat scelerisque enim.
- Morbi vitae elit sapien.
- Maecenas condimentum mollis pretium.
- Nullam et posuere sapien, ut sodales orci.
- Etiam tristique erat eget ex porta facilisis.
- Nullam at mi egestas, blandit nisl posuere, porttitor dui.
- Nam at purus eu metus dignissim cursus.
- Aenean vel commodo nibh.

